You can set the screen with a great many ways, but all of them work by about one principle, which will be paid to. As for other installation work, to install the screen, you should purchase a set of suitable tools and materials. First of all, you should purchase a panel for the cabin, which we will install as a screen. To attach it to the pallet, you will need a drill and a set of screws with dowels suitable for them. To prevent moisture from getting out of the structure, you need an acrylic sealant.
Before starting work on the wall, they mark the places where the panel will be attached. The number of these mounts, depending on the specific situation, varies from two to four. When calculating, we must not forget that the lower tap of the screen panel should rest against the tray. If the pallet is located in the corner of the room, the screen mount is performed directly to the existing walls. In this case, only two panels can be placed.
Having made preparatory steps, drill holes at the marks made and insert dowels into them. We measure the holes so that the weight of the screen is evenly distributed along the mounts. Next, insert the screws into them and fasten the panels to the profiles. The panels must fit both to the pallet and to the wall, the design, while it should be firmly standing.
Almost all sets with screens provide for special fasteners, which are fixed with screen panels.
In the presence of three panels, two of them are mounted to the wall, while the third is used as combining two others. There are four screens in the presence – of which a completely shower cabin is assembled using a consistent docking panels to each other. Fasteners and instructions for this design are always complete with these devices.
If you need pND pipes, fittings, outdoor sewage, you can order via the Internet on the site/.
As already mentioned, in order to avoid the screen leaks, all its joints and connections are processed by the corresponding sealant. At this, the screen of the screen can be considered completed. All that remains to do is to connect the soul and mixer, and with pleasure to use the fruit of your own work. True, not immediately: before using the shower, you should wait for the complete drying of the sealant, which will take about a day. After the deadline, the shower cabin is considered completely ready for operation.