Stages of laying the strip foundation
Foundations for houses and fences are pillar and strip. The strip foundation is used on the heaving lands, or if it is supposed to install a massive fence that will completely block the entire territory of the fenced area.
At first, a trench is born, the depth of which can reach 80 cm or more – the deeper, the more reliable.
With the help of sand, a sand pillow is created, which must be soaked with water.
The reinforcement is laid in a special way. The step between the cells can be set arbitrary.
A wooden formwork is built to a height of up to 35 cm.
A concrete solution is imported to the country, which pour the formwork. In this case, the pillars are immediately installed, which must be set in level before the supply of concrete. They will be used later as supports for the fence itself.
After the foundation freezes, the construction of brick pillars begins, as well as the installation of the entire masonry of the fence.
Stages of laying a pillar foundation
Such a foundation is noticeably cheaper and is used for light fences, for example, made of wood. Only the wooden canvas itself should be thoroughly treated with substances that protect it from decay.
With the help of a drill, pits for pillars are digging, up to 150 cm in depth, at a distance of 2.5 meters from each other.
Wet sandy sands are made in the pits, you can with an admixture of crushed stone, pillows, up to 20 cm.
Pillars are installed, aligned, then pits are covered with sand concrete with an admixture of crushed stone.
After that, either finished spans or guides are attached to the pillars, which are subsequently sheathed with staketins.
Having solved the issue with CASCO, you can safely leave the car in your country. Fence – reliable protection.