Drilling of artesian wells. The main advantage of an artesian well is its huge water use – a debit, which allows you to establish the water supply of whole summer villages. The water level in the artesian well is constant and does not depend on weather factors, allows you to maintain high water quality for a period of 45-50 years. In this article I will tell you about the main stages of drilling such a well.
1.Fighting cementation
Direct cementation is one of the most important stages of the drilling process, it is it that prevents the squat down and creates protection from the streams of upper dirty waters.
2.Counting of a limestone barrel
The next step is drilling inside the casing, the main thing is to choose the right pipe correctly. Direct autopsy. After the drunk trunk, it is additionally strengthened with a perforated column of metal or plastic.
3.Sanition of the well
Sanitioning of a well is the process of disinfection of water from malicious microbes.
4.Geophysical studies
These studies are important in order to find out the quality of a drilled well, their help can be determined by the water supply area and the depth of the well control the integrity of the casing and the depth of their landing.
5.Pumping the well
At the final stage, in water from the well, they are pumped by centrifugal pumps of compression pumps
stations to visually clean water. Now the artesian water well is actually ready to use it with a caisson and a pump after which its year -round begins
Operation.
You can skip the recording and leave a comment. Link placement is prohibited.